Detil Pengarang

    2021

    Tugas Akhir (D3)

    1. Pembimbing 3: (2021), Prakosa,H.K.DAnalisa kegagalan sistem stall warning berdasarkan perbedaan indikasi angle of attack sensor dan minimum manuver speed pada pesawat Boeing 737-800 NG
    2. Pembimbing 3: (2021), Robby,M.BAnalisis Engine/APU Fire Ext Did Not Discharge When The Handle Was Turned pada Pesawat Boeing 737-800NG
    3. Pembimbing 2: (2021), Hafidz,ADesain Alat Uji Impak Metode Charpy Untuk Material Berbahan Plastik Dan Komposit
    4. Pembimbing 3: (2021), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MDesain Miniatur Pasteurisasi Susu Berbasis PLC sebagai Pengembangan Modul Pembelajaran di Laboratorium Sistem Kontrol
    5. Pembimbing 3: (2021), Feryansah,D.APembuatan Cetakan Mangkuk Plastik Ukuran Diameter 80 x 55 mm Sistem Injeksi Kapasitas 100 Produk/Jam
    6. Pembimbing 2: (2021), Roziqin,MPembuatan Sistem Kontrol Otomatis Setrika dan Pelipat Baju dengan Kapasitas 40 Baju / Jam Dengan Arduino Uno
    7. Pembimbing 3: (2021), Syahroni,MPerawatan dan Perbaikan Sistem Air Brake Lokomotif CC 203 Periode 2021 s.d 2024
    8. Pembimbing 3: (2021), Wulandari,R.MPerencanaan Geometrik Jalan dan Perkerasan Lentur Metode AASHTO pada Proyek Jalur Lintas Selatan Lot 8 Jarit - Puger di STA 26 + 150 - 27+ 200
    9. Pembimbing 3: (2021), Sama,P.P.PPerencanaan Jadwal Dan Anggaran Biaya Saluran Pelimpah Pada Proyek Pembangunan Bendungan Jlantah Kabupaten Karanganyar
    10. Pembimbing 3: (2021), Ramadhani,F.YPerencanaan Perawatan Pompa Gear Tipe Tf-02 Di Pt Pertamina Terhadap Vibration Velocity Periode Tahun 2021 S.D. 2023
    11. Pembimbing 3: (2021), Sari,N.S.PPerencanaan Ulang Drainase Pemukiman Daerah Jalan Ranugrati, Sawojajar, Malang
    12. Pembimbing 2: (2021), Julieta,K.WPerencanaan Ulang Sistem Drainase Jalan Di Jalan Raya Gedek - Ploso, Kecamatan Ploso, Kabupaten Jombang, Provinsi Jawa Timur
    13. Pembimbing 3: (2021), Putri,V.APerencanaan Ulang Struktur Atas Gedung Sekolah Pada Proyek Pembangunan Pondok Pesantren Asma'an Kabupaten Malang
    14. Pembimbing 3: (2021), Zulfa,NPerencanaan Ulang Struktur Atas Gedung SGLC Fakultas Teknik UGM
    15. Pembimbing 2: (2021), Azzufar,W.MPerencanaan Ulang Struktur Atas RSU BRI Medika Malang
    16. Pembimbing 3: (2021), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MSistem Keamanan Sepeda Motor Berbasis Arduino

    Skripsi (D4)

    1. Pembimbing 3: (2021), Santoso,M.HAnalisis Perancangan Integrasi Pembangkit Listrik Tenaga Bayu Tipe Savonius Dan Darrieus Di Politeknik Negeri Malang
    2. Pembimbing 3: (2021), Pramudya,M.A.WAnalisis Perencanaan Gardu Trafo Untuk Tambah Daya 690 kVA Menjadi 1385 kVA Pada Rumah Sakit Primasatya Husada Citra Surabaya
    3. Pembimbing 3: (2021), Abimanyu,Y.WAplikasi Algoritma Fuzzy Pada Alat Pengontrol EC ( Electrical Conductivity) Air Nutrisi Tanaman Hidroponik
    4. Pembimbing 3: (2021), Prabowo,H.IModifikasi Radius Rel Bubut Copy Spesimen Standar dan Uji Lelah Hasil bubutnya
    5. Pembimbing 3: (2021), Nurcahya,I.WPengaturan Kecepatan Motor Induksi AC 1 Phasa Berbasis Mikrokontroler Dengan Metode PI
    6. Pembimbing 3: (2021), Nuroctavia,A.FSistem Kendali Suhu Dan Kelembapan Pada Proses Fermentasi Tempe Dengan Metode PID
    2020

    Tugas Akhir (D3)

    1. Pembimbing 3: (2020), Yudhawara,A.CAnalisa Sistem Perangkat Komunikasi High Frequency Dengan Metode FMEA pada Pesawat AIRBUS 330 Garuda Indonesia
    2. Pembimbing 3: (2020), Shandy,A.KAnnotated Translation of The Tipping Point Book from English into Indonesian
    3. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MOtomatisasi Kecepatan Mesin Bor
    4. Pembimbing 3: (2020), Ramadhana,M.APembuatan Cetak Plastik Cover Toothpick Holder Ukuran D 46 mm x 45 mm Kapasitas 144 Produk/Jam
    5. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MPengembangan Sistem Informasi Beban Kerja Dosen Studi Kasus Jurusan Teknologi Informasi Polinema Berbasis Web
    6. Pembimbing 3: (2020), Abdillah,F.APerancangan Solar Tracker untuk Optimalisasi Penangkapan Sinar Matahari pada Concentrared Solar Cooker
    7. Pembimbing 3: (2020), Abimanyu,A.SPerawatan dan Perbaikan Pada Overhead Crane Dengan Kapasitas 5 Ton
    8. Pembimbing 2: (2020), Putra,F.H.WPerencanaan dan Perawatan Pompa Sentrifugal Multistage Kapasitas 400L/Min Periode 2021 s/d 2025
    9. Pembimbing 3: (2020), Habibi,R.RPerencanaan Perawatan Air Handling Unit pada sistem HVAC kapasitas 4387 m²/jam Periode 2021-2025
    10. Pembimbing 2: (2020), Setyawan,P.APerencanaan Perawatan Dan Perbaikan Turbin Tipe Vertical Francis Kapasitas 35 MW Periode 2020 s.d 2024
    11. Pembimbing 1: (2020), Nawari,M.FPerencanaan Perawatan Turbin Vertikal Francis Kapasitas 18 MW Periode 2021 - 2025
    12. Pembimbing 2: (2020), Fikrianto,M.APerencanaan perbaikan dan perawatan pompa volumteric periode 2021 s.d. 2025
    13. Pembimbing 3: (2020), Qobar,Z.IPerencanaan Ulang Jadwal dan Anggaran Biaya pada Pembangunan Tol Cibitung - Cilincing Seksi 4 (STA 24+000 - 29+600)
    14. Pembimbing 3: (2020), Hakim,M.I.APerencanaan Ulang Jaringan Irigasi Tersier Desa Lohbener, Kecamatan Lohbener, Kabupaten Indramayu, Jawa Barat
    15. Pembimbing 3: (2020), M,K.D.P.GPerencanaan Ulang Struktur Gedung Akademik Center Kampus II IAIN Metro
    16. Pembimbing 3: (2020), Pujitama,WPERHITUNGAN ULANG TEBAL PERKERASAN LENTUR DAN ANGGARAN BIAYA PADA PROYEK RUAS JALAN TULUSBESAR - NGADAS KABUPATEN MALANG (STA. 0 + 000 - STA. 5 + 180)
    17. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MPrototype Traffic Light Otomatis Berbasis IOT (Internet Of Things)
    18. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MRancang Bangun Alat Penetas Telur Ayam dengan Pengatur Suhu Otomatis Berbasis IoT
    19. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MStudi Instalasi Main Distribution Panel Gedung Teknik Sipil Politeknik Negeri Malang
    20. Pembimbing 2: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MStudi Literatur Pembuatan Biodiesel dari Minyak Goreng Bekas dengan Katalis NaOH Menggunakan Continuous Stirred Tank Reactor (CSTR)
    21. Pembimbing 3: (2020), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MStudi Literatur tentang Pembuatan Briket Arang Tongkol Jagung dengan Biomassa Lainnya

    Skripsi (D4)

    1. Pembimbing 3: (2020), Rahmawati,EAnalisis Kualitas Daya (Power Quality) Sistem Kelistrikan Di Gedung D2 FIP Universitas Negeri Malang
    2. Pembimbing 3: (2020), Andriansyah,A.YPengaruh Bentuk Probe Pin dan Kecepatan Putar Spindle Friction Stir Welding terhadap Bentuk Struktur Mikro dan Nilai Kekerasan Material Aluminium Alloy Seri 5083
    3. Pembimbing 3: (2020), Rahmayanti,HPengaruh Komposisi ZnCl2-NH4Cl (ACN) dan Waktu Pencelupan Terhadap Kualitas Baja Hasil Proses Fluxing di PT. Bondi Syad Mulia Gresik
    4. Pembimbing 3: (2020), Mulyaningsih,R.SRancang Bangun Sistem Identifikasi Nomor Kendaraan Pada Gerbang Tol Menggunakan Metode Pengolahan Citra
    5. Pembimbing 3: (2020), Alamsyah,RStudi Load Shedding Pada Sistem Penyaluran Tenaga Listrik Di PT. PERTAMINA (PERSERO) RU V Balikpapan
    2019

    Tugas Akhir (D3)

    1. Pembimbing 3: (2019), Pratama,W.AOperational Test dan Troubleshoot Data Printer pada Pesawat Boeing 737-800
    2. Pembimbing 2: (2019), Ramadhani,A.SPengujian Turbin Angin Savonius Tipe-U dengan Sudut Sudu 55 Derajat dan 65 Derajat
    2018

    Skripsi (D4)

    1. Pembimbing 3: (2018), Cahyo,B.DAnalisis Pengaruh Jarak dan Jenis Sinyal GSM terhadap Waktu Respon Injektor Motor Bensin Jarak Jauh Berbasis Android

    Tugas Akhir (D3)

    1. Pembimbing 3: (2018), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MControl Sistem Pengereman Vertical Axis Wind Turbin ( VAWT ) Aplikasi Kapal Laut
    2. Pembimbing 3: (2018), Firmanto,AEfektifitas Penataan Produk Untuk Meningkatkan Volume Penjualan di Alfamart SPBU Sukoraharjo Kabupaten Malang
    3. Pembimbing 3: (2018), Pangestuti,RPengaruh Kualitas Produk Teh Rolas Terhadap Keputusan Pembelian di PT Perkebunan Nusantara XII (Persero)
    4. Pembimbing 3: (2018), Ismawaty,RPengaruh Pelayanan Terhadapan Kepuasan Pelanggan di Bengkel Ahass Kandangan
    5. Pembimbing 2: (2018), Saputra,A.WPerencanaan Ulang Pondasi Tiang Bor pada Proyek Pembangunan Gedung STAIN Kediri
    6. Pembimbing 3: (2018), Ramadhani,A.S., Cahyo,B.D., Saputra,A.W., Pangestuti,R., Ismawaty,R., Firmanto,A., Pratama,W.A., Rahmawati,E., Alamsyah,R., Mulyaningsih,R.S., Andriansyah,A.Y., Rahmayanti,H., Setyawan,P.A., Santoso,M.H., M,K.D.P.G., Prabowo,H.I., Pujitama,W., Nuroctavia,A.F., Abimanyu,Y.W., Pramudya,M.A.W., Fikrianto,M.A., Nurcahya,I.W., Ramadhana,M.A., Habibi,R.R., Abimanyu,A.S., Shandy,A.K., Yudhawara,A.C., Abdillah,F.A., Putra,F.H.W., Qobar,Z.I., Hakim,M.I.A., Nawari,M.F., Syahroni,M., Zulfa,N., Hafidz,A., Ramadhani,F.Y., Putri,V.A., Robby,M.B., Prakosa,H.K.D., Roziqin,M., Feryansah,D.A., Wulandari,R.M., Sari,N.S.P., Julieta,K.W., Sama,P.P.P., Azzufar,W.MRancang Bangun Keamanan Ruang Dosen Ag 1.01 Polinema